Easy Assemble Metal Carports Shed Roof Design Structural Steel Car Garage
Product introduction
This steel structure garage offers 200 sq. ft floor space for your truck car, large-size tools, lawn equipment, and bicycles to store. With a hinged front double door and side door, you can drive in or walk into the shed so easily. Also, the doors with lock holes, ensure organization safety.
Side entry door included and is installable on either side for an option that allows you to customize this shed according to your needs Constructed with electro-galvanized steel sheets and polyester paint for corrosion resistance, rust protection and an overall long lasting, dependable exterior.

Features
1. Different types and sizes according to customer's needs, large or small, wide span: single span or multiple spans, the max span is 36m without middle column.
2. Low cost and maintenance: unit price range from USD30/m2 to USD70/m2 according to customers request.
3.Fast construction and easy installation: time saving and labor saving, all the items are factory-made,pre-cut,pre-welded, pre-drilled,pre-painted.
4.Reduced construction waste, long using lifespan: up to 50 years.
5. Nice appearance.
6. Others: environmental protection, stable structure, High quake-proof, water proof and fire proof, and energy conserving.
Items |
Specification |
|
Main Steel Frame |
Column |
Q235, Q355 Welded H Section Steel |
Beam |
Q235, Q355 Welded H Section Steel |
|
Secondary Frame |
Purlin |
Q235 C and Z purlin |
Knee brace |
Q235 Angle Steel |
|
Tie Rod |
Q235 Circular Steel Pipe |
|
Brace |
Q235 Round Bar |
|
Vertical and Horizontal Support |
Q235 Angle Steel, Round Bar or Steel Pipe |
|
Maintenance system |
Roof Panel |
EPS Sandwich Panel / Glass Fiber Sandwich Panel / |
Wall Panel |
Sandwich Panel / Corrugated Steel Sheet |
|
Accessories |
Window |
Aluminiumn Alloy Window / PVC Window / Sandwich Panel Window |
Door |
Sliding Sandwich Panel Door / Rolling Metal Door |
|
Rainspout |
PVC |
|
Live load on Roof |
In 120kg/Sqm (Color steel panel surrounded) |
|
Wind Resistance Grade |
12 Grades |
|
Earthquake-resistance |
8 Grades |
|
Structure Usage |
Up to 50 years |
|
Finishing Options |
Vast array of colors and textures available |
|
Paint Options |
Alkyd paiting, two primary painting, two finish painting |
|

The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
The usage scale includes large-scale workshop, or warehouse, supermarkets,hangar, entertainment centers and modular steel structure garage.




With the help of modern design software, such as AUTOCAD, SketchUp, 3DS MAX, etc.
We provide comprehensive design and detailing services to all clients.
Quote requirements | |
1 |
Size: Length*width*height _____mm*_____mm*_____mm |
2 |
Wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s |
3 |
Snow load (max. Snow height) _____kn/m2, _____mm |
4 |
Thermal insulation If yes, EPS, fiberglass wool, rockwool, PU sandwich panels, Corrugated steel sheet with fiber glass wool will be suggested; If not, the Corrugated steel sheet will be ok. The cost of the latter will be much lower than that of the former. |
5 |
Door and window quantity & size _____units, _____(width)mm*_____(height)mm |
Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:
(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.
(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.












