Steel Structure Warehouse Building From China

2025-05-07

steel structure warehouse building

Every time Junnan do the Prefab Building Steel Structure design, we will consult the customer's local wind speed, snow load, and the impact of earthquakes. The service life of our designed buildings is up to 50 years.

The roof and wall panels of the Steel Structure Warehouse Building are all made of 75mm EPS sandwich panels. The steel structure building components of the Warehouse Steel Structure building are all hot-dip galvanized, which has a good anti-corrosion effect. All the Prefab Warehouse Steel Structure components load into containers. The parts shipped to clients after fabrication completed in our workshop. We send detailed installation drawings to customers.

Local workers reference our installation drawings to process the erection. Customers need to rent the truck crane, which is about 5-10 tons; it depends on the weight of steel structure components and the size of the warehouse building.

First, install the pillars. Pre-embed anchor bolts connect the column and the foundation. The roof beams assembled and then bolted to the steel pillars.

The Steel Warehouse Building is mainly used to store and transport goods in the warehousing and logistics industry. To ensure the safety of the goods, the anticorrosion, fire prevention, wind resistance, and earthquake resistance of the warehouse are essential. Therefore, the materials and requirements of each component in the Steel Building Warehouse have their corresponding standards.

The primary steel structure systems of steel structure warehouses, such as portal rigid frame columns, beams, joists, and other steel structure components, require rust removal. Through professional surface rust removal treatment, spray epoxy zinc-rich primer twice within 6 hours after shot blasting. Large hexagonal high-strength bolts use to bolt each part together. Rod steel and angle steel are used as braces, and galvanized steel strips are used for purlins. Supports and purlins belong to the secondary structure of the warehouse.

All components of the Warehouse Steel Structure Storage shall be inspected to be qualified before leaving the factory. No secondary processing shall be carried out after each member has passed the inspection. Other steel or steel structural components entering the site shall not be connected by welding except for the design requirements.

The installation of Prefabricated Steel Building is simple, and only workers who need to understand the installation drawing, compared with concrete structures, installing steel structure warehouse buildings does not require many workers. Only 5-10 people can complete the installation of the entire warehouse.

There is no dust or noise pollution. Even if the construction site is in the urban area, it will not affect the healthy life of the surrounding residents. The steel structure warehouse building can move, the entire steel building can disassemble, and then transported to another site to reinstallation. Of course, concrete structures do not have such advantages.