0102030405
Durable Premium Steel Structures for Workshops and Manufacturing

Product Introduction
description2
description2
description2
description2
Product Introduction
description2
description2
description2
description2
In today's rapidly evolving industrial landscape, The construction period of steel workshop building is short, which correspondingly reduces investment costs. Metal structure building have high fire resistance and corrosion resistance. They are lightweight, strong, and have large spans. The construction investment of steel structure workshops is low and economical.

Features
High Strength: Steel frame buildings engineered to support colossal weights, guaranteeing unwavering structural stability.
Lightweight: Significantly reduces structural load and foundation demands.
Swift and Simple Assembly: Fast construction paired with uncomplicated installation.
Specification

Junnan Steel Structure provides single-story steel structure building and multi-story steel structure building.
|
Item name
|
Steel structure building specifications
|
|
main steel frame
|
H section steel beam and comlumns, painted or galvanized, galvanized C section or steel pipe
|
|
Secondary frame
|
hot dip galvanized C purlin , steel bracing , tie bar , knee brace , edge cover etc.
|
|
Roof panel
|
EPS sandwich panel , glass fiber sandwich panel , rock wool sandwich panel , and Pu sandwich panel or steel sheet
|
|
Wall panel
|
Sandwich Panel or Corrugated Steel Sheet
|
|
Tie Rod
|
Circular Steel Tube
|
|
Brace
|
Round Bar
|
|
Knee Brace
|
Angle Steel
|
|
Roof Gutter
|
Color Steel Sheet
|
|
Rainspout
|
PVC Pipe
|
|
Door
|
Sliding Sandwich Panel Door or rolling Metal Door
|
|
Windows
|
PVC/Aluminum Alloy Window
|
|
Connecting
|
post feet bolts, intensive bolt , intensive bolt
|
|
Packing
|
according to the pack list made by our engineer
|
|
Drawing
|
We can make the design and quotation according to your require or your drawing
|
Prefabricated Steel Structures is a new type of building structure system, which is formed by the main steel framework linking up H-section, Z-section, and U-section steel components, roof and walls using a variety of panels and other components such as windows and doors. Light steel structure building is widely used in warehouses, workshops, large factories, and so on.
Project Show
Applications Across Industrial Sectors
Steel factory buildings are widely adaptable across various industries:
Heavy manufacturing: Spacious and unobstructed environments suitable for cranes, presses, and heavy-duty production lines. Electronics and pharmaceuticals: Requires temperature control and often multi-level environments, with potential for cleanroom setups.
Food and chemical processing: Demands strict compliance with fire safety, ventilation, and waste management regulations.
Textiles and light industry: Efficient material flow, typically featuring vertical layouts and integrated freight elevators.
Power and utilities: High-clearance halls suitable for transformers, turbines, and power systems.
Custom engineering facilities: Tailored designs based on prototypes, research, and specialized production needs.
Service We Supply
1. Customized Design


3. The typical construction timeline for a steel factory building
We could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5 star hotel.


2. Production Visualization
Junnan Steel Structure implements whole-process quality management and strictly supervises every process such as raw material supply, engineering design, steel component manufacturing, installation and construction.
Strict product quality control, quality makes the future.This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before Prefab Steel Structure Building delivery.
Strict product quality control, quality makes the future.This is the tenet of our factory. Each product from our factory has strict testing procedures, and must be 100% quality before Prefab Steel Structure Building delivery.


3. The typical construction timeline for a steel factory building
The construction period usually ranges from four to eight weeks, depending on the size and complexity of the building. This efficiency is largely attributed to the use of off-site prefabricated components, which greatly reduces on-site labor and weather related delays.


Certificates

Packing And Delivery
Each section is numbered. Online installation instructions are provided.
Utilizing patented packaging technology to ensure a safe and rapid unloading process for customers.

Related Building
At the same time, we have many experiences in industrial buildings, public buildings, airplane shed, marine engineering, steel structure chicken house, multi-storey buildings, garage, and other fields.
If you interested please contact us !















