0102030405
Steel Structure Logistic Warehouse
Location: Chile
Scale: 27,000㎡
The first phase of the construction project covers an area of 27,000 square meters. The scope of work includes civil engineering, structure installation, architectural finishing, as well as **integrated indoor and outdoor utility pipeline works.














